Chain link fence internal external.
													
																	Chain link fence installation method statement. 
									
		
	
	
		
	
	
		
	
	
		
	
																	Set the line post in place against the layout line adjust it for plumb and temporarily support it in place with braces. 
																	Method statement installation of fencing and gate 1 0 objective of procedure this work method statement covers the fencing works for your project name. 
																	Chain link fabric or mesh is usually sold in rolls 4 5 or 6 feet high. 
																	Civil specifications for the project and owner engineer requirements. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	This item shall consist of furnishing and erecting fencing and gates in accordance to the specifications and the details shown on the drawings or as directed by the e r. 
																	Most chain link posts can be installed by actually pouring the cement in the hole first and then sticking the post in the wet cement. 
																	If using fast set concrete pour the dry mix around each post to a few inches below ground level and add water. 
																	Fence and gate will be doing during the kusile project. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	Leave the concrete a few inches below ground level. 
																	Initially the water will sit on top but eventually will work its way to the bottom. 
																	Set the terminal posts in concrete using a concrete mix as follows. 
																	Installation of chain link fence works to comply with schedule of finishes the general architectural. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	This will incude all the work procedures and instruction that are made by the she and kusile specifications scope this method statement will apply to the instalation of the 2 4 high welding mesh sercurity fence as per drawing supplied by eskom kusile. 
																	Mix a fairly heavy solution as too much water weakens concrete and may cause cracking. 
																	Set terminal posts as tight to the string as possible without touching the string. 
																	Slope it away from the post to help with water runoff. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	1 part cement 2 parts sand and 4 parts gravel. 
																	Method statement installation of fencing and gate 1 0 objective of procedure this work method statement covers the fencing works for your project name. 
																	The purpose of this method statement is to illustrate how the existing fence and shelters will be removed from site in proper and safe way. 
																	Set line posts approx. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	Run a tension bar through the links at the end of the mesh. 
																	Terminal posts should be set 2 higher than the width of the fabric and line posts 2 lower than the fabric width. 
																	Galvanized steel is the strongest mesh. 
																	Make sure the mark you made earlier is at ground level. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	The bar makes the end of the fence rigid and provides something to attach to the posts. 
																	The purpose of this method statement is to describe the procedure which shall be followed for. 
																	Simply push the post into the cement mix in the center of the hole. 
																	Chain link fabric height 2 depth of post in ground total post height. 
															
													
									
		
	
	
		
	
	
		
	
	
		
	
																	Lay the chain link mesh on the ground outside the fence.