Certainteed weatherboards fiber cement siding installation manual 3 keyway a recess or groove in a manufactured shake or shingle siding panel.
Certainteed siding installation instructions.
2015 hardiplank lap siding hz10 quick start installation guide.
Please print this document by clicking the print icon in the web viewer.
J channel should be the same length as the casing.
Lap where two siding panels join horizontally one over the other.
Install 2 layers of weather resistant barrier.
Cedarboards insulated vinyl siding installation.
Around windows doors and other openings use cedarboards accessories.
Use a combination of one length of j channel and one length of drip cap illustration b.
Certainteed weatherboards fiber cement siding was aquired by plycem usa a wholly owned subsidiary of elementia of mexico and is now sold under the brand allura.
Snap the side lineals into place making sure the rain tabs of the top lineal are bent down into the receiving pocket of the side lineals.
Apply a coat of mortar.
When the temperature is less than 40 f leave a 3 8 gap.
Click here to learn more from certainteed.
When the outside temperature is higher than 40 f allow a 1 4 gap between the siding and the trim.
Install j channel around the perimeter of the window opening.
If the lineal surrounds a window frame the bottom corner requires a 45 miter as done previously for the top lineal.
Lineal molding of various widths used to trim door and window openings at the jambs.
Insert the factory or field cut end of the siding panel into the accessories.
2015 hardiplank lap siding hz5 quick start installation guide.
Use two lengths of j channel back to back at the joint between the two courses illlustration a.
Cut the lineals the same length as the window casing.
Start with one end and angle a lineal into the corner block and snap it over the j channel.
Also referred to as casing.
Trim a minimum of 3 4 from the top end of the side lineals.
If a wall requires more than one course of siding you can proceed in one of three ways.